✅ ATIVIDADE – 50 QUESTÕES DE VOCABULÁRIO (Deploy Manager – Eletricidade)
1. The technician must verify the ______ before starting the installation.
A) voltage
B) carpet
C) luggage
D) balcony
2. We need to schedule a site ______ to inspect the equipment.
A) visit
B) ticket
C) envelope
D) mirror
3. The project was delayed due to a supply ______.
A) shortage
B) sandwich
C) pillow
D) holiday
4. Please ensure the cables are properly ______.
A) labeled
B) cooked
C) painted
D) folded
5. The team will perform a safety ______ before the operation begins.
A) briefing
B) wedding
C) haircut
D) drawing
6. The new transformer has a higher power ______.
A) capacity
B) melody
C) perfume
D) silence
7. The contractor must provide a detailed ______ of the work.
A) report
B) bracelet
C) castle
D) dessert
8. The outage was caused by a cable ______.
A) failure
B) flavor
C) tourist
D) wallet
9. The deployment team needs access to the control ______.
A) room
B) spoon
C) cloud
D) candle
10. Please check the grounding ______ before energizing the line.
A) system
B) vacation
C) flower
D) laptop
11. The customer requested a service ______.
A) upgrade
B) necklace
C) beverage
D) sunset
12. All field workers must wear protective ______.
A) gear
B) juice
C) lipstick
D) carpet
13. The supervisor will review the installation ______.
A) checklist
B) postcard
C) sweater
D) rainbow
14. The network ______ needs to be updated.
A) configuration
B) celebration
C) decoration
D) population
15. The team identified a potential safety ______.
A) hazard
B) passport
C) button
D) pillow
16. The backup generator is currently ______.
A) operational
B) invisible
C) edible
D) musical
17. Let’s run a remote ______ of the meter.
A) reading
B) painting
C) swimming
D) dreaming
18. The deployment was postponed due to ______ weather.
A) severe
B) sleepy
C) polite
D) spicy
19. The engineer needs to analyze the power ______.
A) output
B) oven
C) carpet
D) salad
20. Please report any issues to the ______ manager.
A) project
B) carpet
C) museum
D) violin
21. The tower requires immediate ______.
A) maintenance
B) entertainment
C) applause
D) poetry
22. The sensors provide real-time ______.
A) data
B) butter
C) cereal
D) flavor
23. This tool is used to measure electrical ______.
A) current
B) artist
C) cousin
D) stadium
24. The cables were damaged by a power ______.
A) surge
B) violin
C) cookie
D) garden
25. The company invested in new safety ______.
A) protocols
B) envelopes
C) candies
D) backpacks
26. The supervisor asked for the daily ______.
A) summary
B) necklace
C) balloon
D) bicycle
27. The line workers must follow strict safety ______.
A) procedures
B) dishes
C) clocks
D) blankets
28. We must ensure proper power ______ during peak hours.
A) distribution
B) imagination
C) donation
D) pollution
29. The new software improves system ______.
A) performance
B) perfume
C) candle
D) horizon
30. Please check the battery ______ on all devices.
A) level
B) garden
C) emotion
D) scarf
31. The damaged pole needs immediate ______.
A) replacement
B) vacation
C) perfume
D) applause
32. The team will conduct an emergency ______.
A) drill
B) pizza
C) jungle
D) concert
33. The technician must follow the wiring ______.
A) diagram
B) cinema
C) dentist
D) fiction
34. The customer called to report a power ______.
A) outage
B) princess
C) hobby
D) scarf
35. The deployment requires several specialized ______.
A) tools
B) beaches
C) sandwiches
D) memories
36. The installation must comply with safety ______.
A) standards
B) muffins
C) rivers
D) jokes
37. The operations team monitors the grid’s ______.
A) stability
B) haircut
C) calendar
D) tourist
38. The meter is not giving an accurate ______.
A) reading
B) wedding
C) umbrella
D) perfume
39. The workers secured the area with safety ______.
A) barriers
B) cookies
C) pencils
D) pillows
40. The power line is currently ______.
A) energized
B) sleepy
C) wooden
D) spicy
41. The engineer needs the updated site ______.
A) map
B) cake
C) toy
D) onion
42. We completed the system ______ last week.
A) upgrade
B) pillow
C) bicycle
D) carpet
43. The batteries must be fully ______ before use.
A) charged
B) boiled
C) folded
D) melted
44. The project requires additional financial ______.
A) resources
B) chocolates
C) curtains
D) animals
45. The equipment must be tested for ______.
A) reliability
B) sunshine
C) lipstick
D) furniture
46. The crew arrived at the ______ time.
A) scheduled
B) hungry
C) wooden
D) crowded
47. The wires must be properly ______ together.
A) connected
B) painted
C) tasted
D) frozen
48. The technician followed the company’s safety ______.
A) guidelines
B) flowers
C) rivers
D) candies
49. The device automatically shuts down to prevent ______.
A) overheating
B) laughter
C) breakfast
D) decoration
50. The deployment was completed within the expected ______.
A) timeframe
B) forest
C) mirror
D) candy
✅ GABARITO EXPLICADO
1 A – voltage: verificar a voltagem.
2 A – visit: visita técnica.
3 A – shortage: falta.
4 A – labeled: etiquetados.
5 A – briefing: instrução de segurança.
6 A – capacity: capacidade elétrica.
7 A – report: relatório.
8 A – failure: falha.
9 A – room: sala de controle.
10 A – system: sistema de aterramento.
11 A – upgrade: melhoria.
12 A – gear: equipamentos.
13 A – checklist: lista de verificação.
14 A – configuration: configuração.
15 A – hazard: risco.
16 A – operational: funcionando.
17 A – reading: leitura.
18 A – severe: clima severo.
19 A – output: saída de energia.
20 A – project: gerente de projeto.
21 A – maintenance: manutenção.
22 A – data: dados.
23 A – current: corrente elétrica.
24 A – surge: pico de energia.
25 A – protocols: protocolos.
26 A – summary: resumo.
27 A – procedures: procedimentos.
28 A – distribution: distribuição.
29 A – performance: desempenho.
30 A – level: nível.
31 A – replacement: substituição.
32 A – drill: simulado/emergência.
33 A – diagram: diagrama.
34 A – outage: queda de energia.
35 A – tools: ferramentas.
36 A – standards: normas.
37 A – stability: estabilidade da rede.
38 A – reading: leitura.
39 A – barriers: barreiras.
40 A – energized: energizada.
41 A – map: mapa.
42 A – upgrade: atualização.
43 A – charged: carregadas.
44 A – resources: recursos.
45 A – reliability: confiabilidade.
46 A – scheduled: horário programado.
47 A – connected: conectados.
48 A – guidelines: diretrizes.
49 A – overheating: superaquecimento.
50 A – timeframe: prazo.
Nenhum comentário:
Postar um comentário